預(yù)防工地圍擋出現(xiàn)倒塌的措施
來(lái)源:http://kshyinuo.com/ 發(fā)布時(shí)間:2022-09-28
在建筑工地上要以為主的,為了防止工地圍擋的倒塌工作,我們防范措施一定要做好,這樣可以打打地降低險(xiǎn)情隱患、減少施工圍擋倒塌的災(zāi)害損失,那么我們應(yīng)該如何做呢?濟(jì)南圍擋小編為大家詳細(xì)解說(shuō)!
On the construction site, we should focus on safety. In order to prevent the collapse of the fence on the construction site, we must take good preventive measures, so as to reduce the potential danger and reduce the disaster loss caused by the collapse of the fence. What should we do? Jinan Fen Fen Xiaobian explains in detail!
1、按照指揮部要求增加每片圍擋背面固定支撐,每片圍擋背面支撐多增加三根方管,圍擋底腳、背面都采取三角鐵、方管與路邊的防撞護(hù)欄柱焊接成一體的方式固定。
1. According to the requirements of the headquarters, the back fixed support of each enclosure shall be added, and three square tubes shall be added to the back support of each enclosure. The footing and back of the enclosure shall be fixed by welding triangular iron, square tubes and anti-collision guardrail posts at the roadside.
2、工地圍擋支架固定的鉚釘密度,工地圍擋外側(cè)增加與地面角鐵固定密度。
2. The rivet density for fixing the site enclosure support shall be increased, and the fixed density with the ground angle iron shall be increased outside the site enclosure.
3、把原有每十片圍擋設(shè)置一塊空心圍擋改為每三片圍擋設(shè)置一塊空心圍擋,減少風(fēng)的阻力。
3. Change the original one hollow enclosure for every ten enclosures to one hollow enclosure for every three enclosures to reduce wind resistance.
4、在每?jī)善瑖鷵踔g設(shè)置帶有箭頭指示方向的紅色反光警示標(biāo)志,利于夜晚行車(chē),另外每500米圍擋上方設(shè)置一塊直徑80CM的限速30KM或“慢”的標(biāo)志。
4. A red reflective warning sign with the direction indicated by the arrow shall be set between every two fences to facilitate the safety of driving at night. In addition, a sign with a diameter of 80cm and a speed limit of 30KM or "slow" shall be set up every 500m above the fence.
5、加強(qiáng)每天上路巡查力度,對(duì)發(fā)現(xiàn)圍擋有破損或傾倒傾覆的情況及時(shí)進(jìn)行修復(fù)和修正加固,堅(jiān)決把施工圍擋倒塌和造成人員傷害的可能性降低到小。
5. Strengthen daily road patrol, repair and reinforce the damaged or overturned enclosure in time, and resolutely reduce the possibility of construction enclosure collapse and personal injury.
6、項(xiàng)目部認(rèn)真做好天氣變化資料的收集和發(fā)布,特別是臺(tái)風(fēng)、暴雨等惡劣氣象情況更要及時(shí)發(fā)布和告知,以便于采取更為積有效的應(yīng)對(duì)措施。
6. The Project Department shall carefully collect and publish the weather change data, especially the severe weather conditions such as typhoon and rainstorm, so as to take more effective countermeasures.
7、項(xiàng)目部加強(qiáng)人員值班和機(jī)械車(chē)輛管理工作。項(xiàng)目部在臺(tái)風(fēng)和暴雨期間安排專(zhuān)人24小時(shí)值班,值班室設(shè)立在項(xiàng)目部辦公室,固定電話,應(yīng)急小組成員手機(jī)24小時(shí)開(kāi)機(jī)狀態(tài);項(xiàng)目部機(jī)械車(chē)輛都投入防施工圍擋倒塌事件中,平時(shí)在生產(chǎn)中做好維修保養(yǎng)工作,臨警好用。
7. The Project Department shall strengthen the management of personnel on duty and mechanical vehicles. The Project Department shall assign special personnel to be on duty 24 hours a day during typhoon and rainstorm, and the duty room shall be set up in the office of the Project Department, with fixed telephone and mobile phones of emergency team members switched on 24 hours a day; The machinery and vehicles of the Project Department are put into the construction fence collapse prevention event, and the maintenance work is done well in the production at ordinary times, and the temporary police are easy to use.
預(yù)防工地圍擋倒塌,我們可以從以上幾點(diǎn)來(lái)進(jìn)行預(yù)防,希望對(duì)大家有幫助,想了解更多信息,歡迎來(lái)電咨詢我們http://kshyinuo.com!
We can prevent the collapse of the fence on the construction site from the above points. We hope it will be helpful to everyone. If you want to know more information, please call us http://kshyinuo.com !