日韩午夜av在线播放-91色噜噜狠狠色婷婷韩国-中文字幕精品无码一区-国产日韩精品无码一区

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://kshyinuo.com/

地址:山東省濟南市章丘圣井工業(yè)園

當前位置: 首頁 > 新聞中心 > 常見問題

木工加工棚完工后的檢查

來源:http://kshyinuo.com/   發(fā)布時間:2023-01-03

木工加工棚完工后該如何進行檢查與驗收呢?下面跟隨小編一起來看看吧!
How to conduct safety inspection and acceptance after the completion of woodworking shed? Now follow Xiao Bian to have a look!
1.總平面設計
1. General layout design
指定原材料加工區(qū),半成待檢產(chǎn)品存放區(qū),半成待檢產(chǎn)品存放區(qū),成品合格區(qū)垃圾收集區(qū),離地30cm的扶壁建在原材料圍欄的存放區(qū),間距2.0m,按照規(guī)格型號隔離堆放。
The designated raw material processing area, half product storage area for inspection, half product storage area for inspection, garbage collection area for qualified finished products, and buttresses 30cm above the ground are built in the storage area of raw material fence with a spacing of 2.0m, and are stacked separately according to specifications and models.
2.標志和標志的布局
2. Sign and sign layout
(1)各種原材料堆放標志牌,各種待檢工作區(qū),合格產(chǎn)品標志牌應配備齊全。焊接和切割鋼筋時,應設置特殊的危險警告標志,以防止氧氣和乙炔的易燃易爆。安臨時用電警示標志安生產(chǎn)、消防、等安,全文明施工標志。
(1) The signboards for stacking various raw materials, various work areas to be inspected, and the signboards for qualified products shall be complete. When welding and cutting reinforcement, special danger warning signs shall be set up to prevent oxygen and acetylene from being flammable and explosive. Warning signs for temporary electricity use Safety signs for production, fire protection, environmental protection, and civilized construction.
(2)鋼筋加工棚平面布置圖,加各種鋼筋結(jié)構(gòu)尺寸示意圖,各種鋼筋尺寸誤差標準要求圖。
(2) Layout plan of reinforcement processing shed, plus schematic diagram of various reinforcement structure dimensions, and standard requirements diagram of various reinforcement size errors.
木工加工棚
(3)管理人員、質(zhì)量檢查員和操作人員的職責和制度。
(3) Responsibilities and systems of management personnel, quality inspectors and operators.
(4)鋼筋加機械設備操作規(guī)程等。
(4) Operating procedures for reinforcement and mechanical equipment, etc.
3.臨時用電
3. Temporary electricity
(1)加工棚內(nèi)使用的管道須使用合格的材料,不得使用廢料;施工現(xiàn)場架設電力線路應嚴格遵守相關(guān)要求和規(guī)定,確保線路安完整、美觀;
(1) The pipes used in the processing shed must be made of qualified materials, and waste materials are not allowed to be used; The erection of power lines at the construction site shall strictly comply with relevant requirements and regulations to ensure the safety, integrity and beauty of the lines;
(2)電源和照明線路須分開,配電箱內(nèi)的多路配電應標明門、鎖和防雨措施;臨時用電符合規(guī)定,因此須采用TN-S接零保護系統(tǒng),須實現(xiàn)三級配電二級保護和“一機一箱一閘一漏”保護措施。
(2) The power supply and lighting lines must be separated, and the multiple distribution in the distribution box should be marked with doors, locks and rainproof measures; The temporary power supply meets the requirements, so TN-S neutral connection protection system must be adopted, and three-level power distribution two-level protection and "one machine, one box, one switch and one leakage" safety protection measures must be realized.
(3)夜間施工要保證照明設施和足夠的亮度。
(3) Lighting facilities and sufficient brightness shall be guaranteed for night construction.
以上內(nèi)容主要講解了木工加工棚檢查與驗收,本期文章講解到這里就結(jié)束了,更多精彩內(nèi)容可以來我們網(wǎng)站http://kshyinuo.com進行咨詢了解!
The above content mainly explains the safety inspection and acceptance of the woodworking shed. This article ends here. More wonderful content can be found on our website http://kshyinuo.com Ask about it!

欧美亚洲综合一区二区三区| 色哟哟色播一区二区三区| 一区二区三区日韩精品| 欧美色欧美亚洲一区二区三区 | 蜜臀av一区二区精品字幕| 色狠狠一区二区三区中文 | 日韩精品色av一区二区| 97久久精品丝袜美腿影院| 色狠狠一区二区三区中文 | 亚洲欧美精品一区久久| 福利在线视频欧美激情| 综合亚洲欧美一区二区| 国产综合久久一区二区三区| 午夜福利小视频在线看| 欧美日韩精品区一区二区三| 国产盗摄国产盗摄视频在线| 八上语文富贵不能淫课文| 亚洲欧美综合一区自拍| 国产综合久久一区二区三区| 撒玛利亚少女电影免费观看| 蜜臀av一区二区精品字幕| 极品熟女午夜福利影院| 日本精品高清视频一区二区三区| 国产精品日本孕妇网站| 五月六月丁香激情综合| 五月天欧美亚洲大片欣赏| 综合亚洲欧美一区二区| 精品视频美女一区二区三区| 亚洲黄色av影片久久久| 外国美女激情午夜在线观看视频| 日韩欧美视频午夜福利视频| 五月天色婷婷色丁香色| 国产综合久久一区二区三区| 国产一级二级三级精品小视频 | 在线精品国产亚洲av蜜桃| 国产精品一区二区三区网站视频| 亚洲黄色av影片久久久| 在线精品国产亚洲av蜜桃| 五月六月丁香激情综合| 欧美日韩一级特黄大片| 国产高清免费视频足控网站|