木工加工棚一般常規(guī)下的產(chǎn)品詳情
來源:http://kshyinuo.com/ 發(fā)布時(shí)間:2022-07-11
木工加工棚是我們工地施工現(xiàn)場(chǎng)常見到的物品,起到的作用非常大,主要是保護(hù)周圍人員以及現(xiàn)場(chǎng)施工順利,下面來講講一般常規(guī)下的產(chǎn)品詳情內(nèi)容吧。
Woodworking shed is a common item on our construction site, which plays a very important role, mainly to protect the safety of surrounding personnel and the smooth construction on site. Now let's talk about the details of products under general conventions.
1.木工加工棚采用國(guó)標(biāo)鋼材制作。
1. The woodworking shed is made of national standard steel.
2.高壓焊接,雙層防砸結(jié)構(gòu)。
2. High pressure welding, double-layer anti smashing structure.
3.標(biāo)準(zhǔn)化設(shè)計(jì),全拼裝式,組裝,拆卸簡(jiǎn)單,方便運(yùn)輸。
3. Standardized design, full assembly, simple assembly and disassembly, convenient transportation.
4.地面需要硬化,立柱基礎(chǔ)澆筑700*700*700mm混凝土,預(yù)埋300*300*12mm鋼板。
4. The ground needs to be hardened. The column foundation is poured with 700*700*700mm concrete and embedded with 300*300*12mm steel plates.
5.可根據(jù)客戶尺寸、材料的實(shí)際需求定制。
5. It can be customized according to the actual needs of customers' size and materials.
木工加工棚一般需根據(jù)施工計(jì)劃,安置鋼筋對(duì)焊機(jī)、切斷機(jī)、彎曲機(jī)、調(diào)直機(jī)......等設(shè)備的數(shù)量及加工流水線;另還需考慮部分鋼筋原材料、加工后鋼筋的周轉(zhuǎn)及堆放;現(xiàn)場(chǎng)施工場(chǎng)地、用電等條件來確定;故鋼筋加工棚一般跨度在12~18m,,長(zhǎng)度盡可能大于30m。
Generally, the woodworking shed needs to install steel bar butt welding machine, cutting machine, bending machine, straightening machine according to the construction plan The number of equipment and processing lines; In addition, it is also necessary to consider the turnover and stacking of some reinforcement raw materials and processed reinforcement; On site construction site, electricity and other conditions; Therefore, the reinforcement processing shed generally has a span of 12~18m and a length of more than 30m as far as possible.
木工加工棚的搭設(shè)還要注意一下幾點(diǎn):
The following points should be paid attention to in the erection of woodworking shed:
1.工具式木工加工棚搭設(shè)具體尺寸根據(jù)現(xiàn)場(chǎng)實(shí)際情況確定。
1. The specific size of the tool type woodworking shed shall be determined according to the actual situation on site.
2.搭設(shè)在塔吊回轉(zhuǎn)半徑和建筑物周邊的加工車間設(shè)置雙層硬質(zhì)防護(hù)。
2. The processing workshop set up around the slewing radius of the tower crane and the building is provided with double-layer hard protection.
3.加工車間地面需硬化,宜選用砼地面。
3. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
4.加工車間頂部應(yīng)張掛警示標(biāo)識(shí)和宣傳用語(yǔ)的橫幅,橫幅寬度宜為1m。
4. Warning signs and banners of propaganda words should be hung on the top of the processing workshop, and the width of the banner should be 1m.
5.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌,圖牌的尺寸為:寬×高=2000mm×1000mm。
5. The tool type reinforcement processing shed needs to hang the operation specification drawing board at the eye-catching place, and the size of the drawing board is: width × Height =2000mm × 1000mm。
6.各種型材及構(gòu)配件規(guī)格為參考值,具體規(guī)格應(yīng)根據(jù)當(dāng)?shù)仫L(fēng)荷載、雪荷載進(jìn)行核算。
6. The specifications of various profiles and components and fittings are reference values, and the specific specifications should be calculated according to the local wind load and snow load.
7.南方地區(qū),如遇臺(tái)風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。
7. In the south, in case of typhoon, windproof measures should be taken, and wind ropes can be set.
以上就是今天為大家介紹的關(guān)于問題以及注意事項(xiàng)的全部?jī)?nèi)容,希望對(duì)大家能有所幫助,想要了解更多內(nèi)容可以電話聯(lián)系我們或者關(guān)注我們的網(wǎng)站http://kshyinuo.com,我們的工作人員會(huì)及時(shí)與您取得聯(lián)系。
The above is all about the problems and precautions introduced to you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://kshyinuo.com , our staff will contact you in time.